Trusted by diaspora builders in 4 countries

Build in Ghana.

Without the worry.

Your construction funds are locked in escrow and only released when independent inspectors verify each phase is complete. Track every block, every cedi, every step — from London, Amsterdam, New York, or Toronto.

Start Your Project
Funds secured in escrow
Video verified inspections
Property passport included
Adjiriganor Residence
East Legon Hills, Accra
On Track
Phase 3 of 551% Complete
Escrow Balance
GHS 450,000
GHS 300,000 released · GHS 450,000 locked
$39,150 · £30,150 · €36,000 locked
Phase 2 Inspection Passed
Video report available
Live Tracking
Scroll to explore
0+
Projects Managed
GHS 0M+
Funds Secured · $7.8M+ · £6M+ · €7.2M+
0+
Verified Contractors
0%
On-Time Completion

The problem we solve

Every year, thousands of Ghanaians abroad send money home to build. Too often, that money disappears into delays, overcharges, and unfinished projects — with no way to verify from overseas.

Without Tumi Strux
Send money and hope for the best
No way to verify construction progress
Contractors request more funds with no accountability
No documentation of materials or workmanship
Properties sold with zero build history
Disputes have no resolution process
With Tumi Strux
Funds locked in escrow — released only on verification
Independent inspectors verify every phase on-site
Video walkthroughs you can watch from anywhere
Every material graded and documented
Property passport adds value at resale
3-level dispute resolution built into every project

How Tumi Strux works

Five steps between you and a verified, documented property — all without setting foot on site.

Step 01

Deposit into Escrow

Your full construction budget is deposited into a secure escrow account. Funds are locked and protected — no one can touch them without your approval.

Step 02

Construction Begins

Your contractor starts building. The project follows a 5-phase milestone system. Each phase has defined deliverables that must be completed before any funds are released.

Step 03

Independent Inspection

At each phase, we send an independent inspector to verify the work. They produce a narrated video walkthrough and detailed report — uploaded for you to review.

Step 04

Review & Release

You review the inspection report and video from wherever you are. Happy with the work? Approve the release. 20% of escrow is sent to the contractor. Not satisfied? Request remediation.

Step 05

Property Passport

Every material, every wire, every pipe is documented. When your build is complete, you receive a full property passport — the most comprehensive building record in Ghana.

Everything you need to build with confidence

Milestone Escrow

5-phase releases. 20% per phase. All-or-nothing — no partial payments, no ambiguity. Your money moves only when the work is verified.

Video Inspections

10-minute narrated walkthroughs at every phase. 20+ photos. Detailed checklists. Independent inspectors rotated to prevent collusion.

Contractor Ratings

Every contractor rated on 5 dimensions: quality, timeline, communication, budget discipline, and safety. Dual-source scoring from investors and inspectors.

Property Passport

Complete digital record: materials graded, electrical and plumbing mapped, inspection videos archived, maintenance schedule included. Unprecedented in Ghana.

Verified Directory

Browse rated bricklayers, electricians, plumbers, painters, and suppliers. Every tradesperson verified with ID, references, and past project evidence.

Property Sales

List completed properties with full build history. Buyers see material grades, inspection videos, and property grades. Sell faster, sell higher.

From our builders

Real stories from the diaspora community

I built a 4-bedroom house in Tema from London without visiting once during construction. The video inspections gave me total peace of mind. I could see exactly what was happening at every stage.

KA
Kwesi Appiah
London, UK
4-bed single storey, Tema

The escrow system changed everything. Before Tumi Strux, I sent GHS 500,000 home and the contractor disappeared after the foundation. This time, every cedi was accounted for.

AM
Abena Mensah
Amsterdam, NL
Two storey residential, Kumasi

When we sold the property, the buyer offered 15% above asking price because of the property passport. They said they had never seen documentation like that for a Ghanaian property.

KB
Kofi Boateng
Toronto, CA
3-bed with boys quarters, East Legon

Simple, transparent pricing

No hidden fees. You see exactly what you pay at every stage.

2-3%
Escrow Fee
Of total build cost. Covers fund security and platform management.
~1%
Inspection Fee
Covers 5 independent on-site inspections with video reports.
2%
Sales Commission
Only if you sell through the platform. Property passport included.
Example: GHS 750,000 Build · $65,250 · £50,250 · €60,000
Escrow Fee (3%)
GHS 22,500
$1,958 · £1,508 · €1,800
Inspections (~1%)
GHS 7,500
$653 · £503 · €600
Sale (at 1.8M)
GHS 36,000
$3,132 · £2,412 · €2,880
Total Platform Cost
GHS 66,000
$5,742 · £4,422 · €5,280

Ready to build with confidence?

Join hundreds of diaspora investors who are building their dream properties in Ghana — with full transparency, independent verification, and their funds protected every step of the way.

Start Your Project
No commitment required
Free consultation
Funds secured from day one